Description
The project involved the installation of a new scaped surface process vessel to increase production capacity. The process team designed the optimum layout in the limited space available and allowed for a future extension to accommodate a further vessel with minimal modification.
Arctica were also responsible for the provision of the tender documentation including specifications, drawings, tender adjudication, and engineering support.
The installation took place in a live environment with minimal disruption to production.