Cold Store, Gloucester

Description

A cold store with a 66,000-pallet capacity for Wall Ice Cream was constructed with a clad-rack system and robotic pallet handling.  The building is 32m high with a total floor space of 25,000m2.

Arctica were responsible for the architectural input, including the amendment of an existing (non-determined) planning application and gaining approval.

The 2-storey despatch and picking facility has 16 docks and operates at minus 280c.  The project included offices, amenities, and a plant room.

Gallery

More Projects

Menu